Challenge
A Tier 1 automotive supplier was losing an entire shift of press time every time a job changed. Each changeover meant rebuilding the full tooling setup from the ground up, averaging 8 hours of downtime. On top of that, the legacy booms were so heavy that swapping them by hand was physically taxing and hazardous for operators.
Add in the service costs of bringing tooling-provider technicians on-site for every changeover, and productivity, safety, and profitability were all taking a hit.